Tungsten mining and processing

A staged mining opportunity linking a licensed deposit to saleable concentrate or a selected downstream product. Early capital can support resource definition, recovery testing and engineering before mine construction. Proposed scale: Resource-led mine and processing development Preliminary capital reference: 12.80 USD million The amount refers to the full proposed scope. The first-phase budget and funding structure will be agreed after technical quotations and scope validation. Project basis: This is a proposed investment concept. Capacity, ownership and operating rights, permits and transaction terms require project-specific confirmation. Confirm licence boundaries, reserves, grade, recovery, mine life, water and tailings; negotiate specification-based offtake. Project equity, a technical or operating partnership, equipment finance or an offtake arrangement may be considered. The structure and investable rights will be agreed with the authorised project owner.